🏗️ Infrastructure · Visayas

Bridges, roads, rail, airports, ports, power lines and water projects: built, being built and planned.

AklanAntiqueBiliranBoholCapizCebuEastern SamarGuimarasIloiloLeyteNegros OccidentalNegros OrientalNorthern SamarSamarSiquijorSouthern Leyte 12. San Juanico Bridge · operational1210. Cebu–Negros–Panay 230-kV Backbone (CNP) · operational102. Marcelo Fernan Bridge (2nd Cebu–Mactan bridge) · operational23. Mactan–Mandaue Bridge (1st Cebu–Mactan bridge) · operational34. 4th Cebu–Mactan Bridge and Mandaue Coastal Road · approved48. Mactan–Cebu International Airport · operational85. Panay–Guimaras–Negros (PGN) Island Bridges · planned56. Cebu Bus Rapid Transit (CBRT) · operational67. Metro Cebu Urban Mass Rapid Transit (UMRT) · planned71. Cebu–Cordova Link Expressway (CCLEX) · operational111. Cebu–Bohol 230-kV Interconnection (CBIP) · operational119. Bohol–Panglao International Airport · operational9
  1. 1

    🌉 Cebu–Cordova Link Expressway (CCLEX) operational

    The toll bridge linking Cebu City and Cordova on Mactan opened in 2022.

    Cebu · opened 2022 · [1]

  2. 2

    🌉 Marcelo Fernan Bridge (2nd Cebu–Mactan bridge) operational

    The second Mandaue–Mactan bridge opened in 1999.

    Cebu · opened 1999 · [1]

  3. 3

    🌉 Mactan–Mandaue Bridge (1st Cebu–Mactan bridge) operational

    The first bridge between Mandaue and Mactan Island was inaugurated in 1973.

    Cebu · opened 1973 · [1]

  4. 4

    🌉 4th Cebu–Mactan Bridge and Mandaue Coastal Road approved

    The JICA-funded P76.4-billion bridge and Mandaue coastal road is moving forward after DPWH-7 adopted the Lapu-Lapu coastal road alignment in July 2026, but relocation and funding issues remain.

    Cebu · ₱76.4 billion · [1] [2]

  5. 5

    🌉 Panay–Guimaras–Negros (PGN) Island Bridges planned

    Detailed design was finished in July 2026; DPWH plans to start building the 33-km Leganes–Guimaras–Pulupandan bridges in late 2027 for completion by mid-2033, at an estimated P331.59 billion.

    Iloilo, Guimaras, Negros Occidental · ₱331.6 billion · target 2033 · [1] [2]

  6. 6

    🚌 Cebu Bus Rapid Transit (CBRT) operational

    Package 1 (South Bus Terminal–Capitol area, 2.38 km) began operating in 2026 after a decade of delay, but the World Bank cancelled US$84.9 million in undisbursed funds and DOTr is seeking PPP funding to finish it.

    Cebu · opened 2026 · [1] [2]

  7. 7

    🚆 Metro Cebu Urban Mass Rapid Transit (UMRT) planned

    DOTr says a 67.5-km underground railway from Danao to Carcar, with a 25-km line to Mactan-Cebu airport, is in the pipeline.

    Cebu · [1]

  8. 8

    ✈️ Mactan–Cebu International Airport operational

    Cebu's main gateway on Mactan Island in Lapu-Lapu City opened in 1966.

    Cebu · opened 1966 · [1]

  9. 9

    ✈️ Bohol–Panglao International Airport operational

    Bohol's airport on Panglao Island opened in 2018.

    Bohol · opened 2018 · [1]

  10. 10

    ⚡ Cebu–Negros–Panay 230-kV Backbone (CNP) operational

    NGCP energized the last stage of the 230-kV Cebu–Negros–Panay backbone on 27 March 2024, adding 400 MW of transfer capacity between the three islands.

    Cebu, Negros Oriental, Negros Occidental, Iloilo · ₱43.4 billion · opened 2024 · [1]

  11. 11

    ⚡ Cebu–Bohol 230-kV Interconnection (CBIP) operational

    NGCP's P19.76-billion link with 54.6 km of submarine cable and 97.6 km of overhead lines was fully energized in September 2024, giving 1,200 MW of capacity.

    Cebu, Bohol · ₱19.8 billion · opened 2024 · [1]

  12. 12

    🌉 San Juanico Bridge operational

    The bridge across the San Juanico Strait linking Samar and Leyte opened in 1973.

    Samar, Leyte · opened 1973 · [1]

Compiled from DPWH, DOTr, NGCP and news reports; status as of 2026-10-05. Each item links its sources.